Showing posts with label pool. Show all posts
Showing posts with label pool. Show all posts

Tuesday, September 28, 2010

Maybe a third of one percent away from completion...?

Gosh, I see it has been two months since I last posted on this blog, which is a sign that the house really is so very, very close to completion that there isn't much to say.

We went away on our UK vacation in August, and returned to find the house apparently finished. All the outstanding items on our punch list had been taken care of, with the exception of the exterior lights snafu at the front of the house. We can only have the motion sensor light on if the two garage lights remain switched on; so we end up with the garage lights on all night in order to ensure that the motion sensor light - essentially a fancy security light - would come on if someone approached the front door. The electricians who worked on the house deny having tampered with this electrical circuit, and so fixing this is seemingly outside the scope of the job. (The fact that the lights never had that problem before also seems to be immaterial.)

So we have been living with the house for a month, picking up little things here and there that need fixing. Nothing too major, I hope. The motion sensor light in the back yard isn't working at all. The motion sensor light outside the laundry room door only comes on if you approach it whilst waving your arms in the air. Then there is a bunch of small carpentry items: creaking or rubbing doors, sticking drawer, misaligned bolt, that kind of thing. I hope that Site Supervisor II will be able to tackle most of them pretty quickly, though I wonder whether the electricians will deign to visit us for the electrical fixes.

We had a "duh" moment today. The light in the pool stopped working and we couldn't understand why, as it had been working just fine. Anyway, in an email, SS2 mentioned "the exterior GFI", so I had an "ah ha" moment...took Hubby out into the back yard with a flashlight...found an outlet in the exterior wall and got him to inspect it. Sure enough it had a reset button, which we duly reset and - ta da! - like magic, the pool light came back on. What a team we all are.

Tuesday, July 13, 2010

One percent away from completion

The exterior screen doors actually arrived yesterday, just after I'd written the day's entry. SS2 will be here later on to install them. He was here this morning to reattach something in the hallway bathroom that the Architect had pulled off the wall by mistake some time ago (!) and also to investigate the non-functioning lights.

We also had part II of a visit from the tub refinishers, who have been working on the guest bathroom tub. I just took a peek. It looks perfect. I guess we shall have to see what happens, as it looked perfect after the last attempt at sealing it. Did I mention that the refinishing stinks?

I had a quick meeting with the Landscape Designer. We had a delivery of another 30 or so plants this morning and she was here to place them out before planting. I pointed out that the pool cover still isn't closing properly and that a stone has fallen out of the walkway by the guest bedroom. She tells me that the grass is forecast to be laid this week.

Our neighbors started their demolition preparation this morning. They actually managed to have a piece of equipment I'd never seen before, and I thought I'd seen it all. (I had to stand on a chair next to the fence to look over and see it. Nosy neighbor, moi?)

Monday, July 12, 2010

Can't Get Enough of That Outdoor Living Thang

I've been spending money again. Today I ordered another extending patio table - this one extends to 130", a full 20" longer than the last one - with six chairs, a 10' by 13' rectangle patio umbrella (in taupe Sunbrella fabric), and an umbrella stand capable of stabilizing 70lbs of weight. As the umbrella is custom made, it won't be ready for about four weeks (i.e. the end of the summer), but the table and chairs will be here next Tuesday. This will give us dining capacity for 22, which is about what we need.

I've also sent my three old teak chairs - purchased about 13 years ago in England - to the patio furniture vendor to be refinished to their original brown color.

Meanwhile, back at the outdoor kitchen, the appliance guy was here again today to tweak the warming drawer, which is now straight in its space.

Inside the house, SS2 was here this morning with Dave the Bath Vendor, who started refinishing the tub in the guest bathroom. It stinks.

Remaining items:

The House:
- two exterior lights are not working.
- screen doors will be coming in about 10 days
- one sliding screen door is loose on its track

The Garden:
- still some plants on site needing to go in
- waiting for some plants to arrive, most notably two espaliered mandarin orange trees for the fence
- grass to be laid in the back
- mulch to be added everywhere
- landscape lighting to be installed (waiting for lights to come)
- the pool cover is still not closing properly every time (small gap on one side)
- pool light is not working, and different subcontractors are currently blaming each other
- mastick around the pool
- cleaning and re-sealing of the stone patio(to combat the redwood staining)
- doors under the outdoor kitchen sink need adjusting (one has sagged)
- fence repair where a couple of planks have fallen down
- creation of gate next to the office, for the "dog run" area
- a stone has fallen out of the hardscape and needs to be glued back in

Wednesday, June 2, 2010

Revenge of the Killer Squirrel

Well, it might not be squirrel damage, but we're not sure we can explain what the problem is otherwise. Our previously functioning solar power heating for the pool has sprung a leak - a big leak, in fact. The new pool maintenance service sent me an email saying that they'd put the solar on, then turned it off as "water was pouring off the roof". They said we'd need a new panel to replace one that was damaged.

We are always skeptical when things suddenly go wrong. So we turned on the solar and, darn it, water poured off the roof. Here's a photo of Deep Thought experiencing our impromptu roof shower.


This didn't stop us having friends over for lunch on Sunday. Seven children and one brave adult went swimming in our low-80sF water. Reports are good, though Deep Thought said she couldn't really tell that the plaster was much smoother than the old kind. However, since none of the kids got out with "raspberries" on the bottom of their toes, I guess this was a successful experiment.

Friday, May 28, 2010

More action, more problems

Today the sun is shining, though there are ominous black clouds. The forecast is for dry weather until next Friday, when yet another day of rain is apparently due. Unbelieveable!!

Our stone mason says he will be finished by the end of today. The men are busily grouting the back patio. I asked him for his card. As he is a subcontractor he didn't want to give it to me. They're all terribly ethical, these workers. I prised his website out of him - and of course just at the moment that he was handing the bit of paper back to me, the hardscaping boss arrived, and we both looked guilty. I hope I didn't get him into trouble. I was just thinking of friends of ours who want a small patio built, a job that's really too small for the main hardscaping company to want to bother with.

The stone fabrication guys were here today to look at the outdoor kitchen. They said that someone else has to attach plywood to the walls so that they can put the counter top on, and then they went away. Mentioned this to the handscaping head, who looked blank and said that they never do that piece - it is always taken care of by the granite folks. So that'll be a phone call taking place later today.

Got an email from the pool servicing company to say that our solar panels have sprung a leak. They say that it looks like one panel is damaged and needs to be replaced. Bah.

The sheet metal fabricators are also here today, installing the downspouts.

Friday, May 21, 2010

Splish Splosh!

The wind is chilly, the pool has reached 80F, and Little Starlet has been swimming! The new pool is officially open!

Thursday, May 6, 2010

The Creation of Beautiful Smoothness

The theme of the day is smoothness.


Inside the house, SS2 has been working on patching the walls in the living room, following the moving of some of our light switches.


Outside the house, the workers from the hardscaping company are grouting the stone in the front yard.


The stucco subcontractors are applying the final coat to the exterior of the house, and are doing a wonderful job at making everything look even. They are also putting the brown coat on the garden wall out front.


Finally, the pool is almost full of water - and glassy smooth (despite the gunk floating in it!).

Wednesday, May 5, 2010

Wet and Wonderfully Smooth

It's been a busy day around the Cardboard Box today. Site Supervisor II is anxious to be done with the inside.

The electricians finally showed up fully equipped with their tools. They replaced and fixed most of the small things on the list. The sky lights in the kitchen are still not working, but they diagnosed that the transformers are faulty/defunct. They are going to try to source new ones for tomorrow and come back to install them. They did move the three light switches in the living room that were floating free on the walls, far from the wooden trim; and also installed a new outlet in the kitchen over the wine fridges. Hubby will be pleased as this means he can now set up his new coffee maker.

SS2 has installed the trim strip at our master bedroom exterior door and has repaired the sliding door in the guest bedroom which stopped locking yesterday.

Outside, the stone work has continued. The front is almost done. The fence is complete, all we need is the new gate by the guest bedroom, which has to wait for the wall to be stuccoed. Speaking of which, the wall has been prepped for stucco, with a wire frame added to all the edges.





The big news of the day is that the pool has been plastered and we are currently filling it up with water. We have to leave it filling overnight. If the water is turned off, then a water line will form on the new plaster. (We chose French Grey "Wet Edge" plaster, which is supposedly the smoothest on the market.)

Monday, May 3, 2010

A No Excuses Day

Very sunny day today - after a blazingly hot weekend. The stone mason is hard at work in the front yard laying the paving. The fencing guys are back, currently building the double gate at the side yard from scratch. Site Supervisor II has gone to the cabinet makers' shop to tell them to get the inside of the TV cabinet right, and to pick up the framing that needed to be adjusted in order to allow the cabinet doors to close as they were designed to do. Santa Claus appears to be working in the pool. Well, I guess he has to do something in the off season.

Saturday, January 30, 2010

Kitchen continues even though it's Saturday

The drywall workers turned up at 8:15am to continue skimming the kitchen walls. Bit of a surprise when they started rattling on the front door, as no one had warned me they were coming.





Photos:
one of the drywall workers on his stilts to do the upper walls;
the pool coping installed;
the garage full of kitchen cabinets;
and the humorous labelling of the cabinets by the makers.

Thursday, January 28, 2010

Random Photos

Here's a bunch of photos reflecting yesterday's and today's activity around the house. Spot the guys on the roof installing skylights. Also the night shot of CAT with new window, and this morning's trenches.





Activity Explosion

The rain finally stopped yesterday morning and we suddenly saw an explosion of activity in and around the Cardboard Box.

First, the windows that have been patiently sitting in the garage have been installed. We are now fully fenestrated, both in walls and roof.

Second, the kitchen demolition was completed. Floor totally gone. The central island wall has been moved about two inches to give more space between the refrigerator wall and the center island (so that Hubby and I will need to engage in less physical contact whilst cooking and cleaning up).

Third, the dry wallers (that's plasterers to the Brits out there) have appeared in the kitchen to repair the walls. They have incredibly funky stilts for plastering the upper parts of the wall, like prosthetic lower legs. Fabulous, I am sure the kids would like some.

Fourth, the kitchen cabinets have arrived and are in the garage awaiting installation.

Fifth, the landscapers are trenching in the front yard with great vigor. They are laying drainage pipes.

Sixth, the pool people are out back putting the new Connecticut blue stone coping around the edge of the pool. Mike the Pool explained that this will be the last thing they do until the rest of the hardscaping is in. They'll be back to plaster the pool, fill it, brush it and install the cover later in the process.

I'm sure I've forgotten something, but that seems like a fair bit to me.

Wednesday, January 13, 2010

Pool progress again

The weather did its Californian monsoon thing this morning. One moment dry and sunny, the next pouring buckets, another moment sunny again. Result: big puddles all across the back yard.

Not much happening in the house at the moment. The electricians were here again today, moving cables and panels and such like, in preparation for a slew of city inspections tomorrow. I hope none of the inspectors cares about the tree protection fencing, which is leaning at a rakeish angle.

According to Site Supervisor II, the house remodel is now being held up by the windows order. They really can't get on with finishing the walls until the windows are installed, which makes sense. I imagine we'll learn more about the impact on the schedule at tomorrow's site meeting.

The landscaping is going along though. The Jolly Demo Man finished clearing all of the rubble away, front and back, and the BobCats have gone again. So we are ready for hardscaping action, pending completion of the necessary elements of the pool. In the pool, two men have been working away today installing the waterline tile and it looks just about done. I'm not sure if coping or plastering comes next.

In other news, yesterday I received three invoices from the Arborist. Turns out that his initial estimate did not include the charges for the crane hire, so his bill is twice as much as his estimate. Also it looks like he is trying to charge me twice for removing the same pine stump. I complained to the Landscape Designer about this - as she recommended we use him - and she said she'd call him.

Tuesday, January 12, 2010

Rain, Rain, Go Away, come again on Friday

It rained a lot over night, and our back yard is doing its best Somme impression.

The Jolly Demo Guy was out in back again this morning with his jack-hammer. Quite what he could find to dig out this time was beyond me, but he managed to produce yet more bricks and rocks. Astonishing.

He is also working away at the front clearing rubble. We are the proud foster parents of a CAT in the back and a BobCat in the front. Yesterday the back yard CAT was busily removing piles of debris from the pool, and then it stopped. This morning I noticed that we still have two large piles of rubble in the far corner of the back yard. Are they, like, someone else's rubble to deal with? Do the demo guys only deign to take their own rubble? Oh come on.

The pool has a puddle in the bottom from the rain. I'm not sure what comes next for the pool, could be the tile or the new plaster. The new coping is supposed to be arriving next week some time.

I approved new doors for the house interior today. Chose MDF over Douglas Pine on the grounds that it is (1) harder and less prone to denting, (2) easier to prep for painting and gives a smoother finish and (3) is cheaper. This may be the first item in the whole remodel that we've chosen (or had chosen for us) the cheaper option.

Hubby is still engaged in a life-or-death struggle with the landscape designer over his choice of BBQ grill for the outdoor kitchen. He keeps saying "I want charcoal" and she keeps sending over plans including a gas grill. I said to her last week, there's a "Man he make fire" thing in play here. Hubby will either get his way or she will grind him down and make him change his mind. I'm just an innocent spectator on the side lines.

Quite a lot of banging today from the bedroom/bathroom addition. It's a little frustrating because it is now impossible to have a nose about and see what they're up to. At the end of each day the workers nail up temporary shutters on all the openings to the outside, which is good for security, but bad for curiosity. I know the electricians have been in today. They stopped me to ask what some switches operated, and of course I didn't know. I never know. They must think I am some gormless bimbo, or that I am a recently acquired trophy wife! (LOL, as the young folks say.)

Monday, January 11, 2010

The Gentle Hum of Disposal

I am almost light headed with the lack of horrible noise. Just the teeniest bit of jack-hammering in the pool this morning - most of which I managed to miss by arranging a first-thing-in-the-morning appointment elsewhere - and now all I have around me is the gentle hum of the BobCats running back and forth, moving rubble and old plaster from the yards into the waiting truck out front.

Maybe the neighbors won't torch the house after all.

Saturday, January 9, 2010

Elf and Safety

One of the things I've been meaning to comment on is the lack of health and safety obsession we're seeing in our building crews. It all seems very different to the UK. Take, for example, the two jolly guys who have been demolishing our front yard last week. Both are using hand-held jack-hammers. Neither is wearing a hard hat, gloves, or eye protection. They do seem to have ear plugs in, but they aren't wearing those all-singing and dancing ear protectors that are common in the UK. The one with the moustache was wearing jeans and a vest/singlet to do his work this week. The other one is at least wearing a long sleeved shirt.

The men working in the pool renovation, who are also using jack-hammers, though smaller ones, are wearing goggles, but again no hats, gloves or other protective gear.

Everyone seems to wear proper boots, but they don't look like anything special.

The men from Jim's Bunch haven't worn any special gear either. They are up on the roof without hats, no knee pads or anything when they are crawling around. They were wearing gloves when they were handling the lumber, so I suppose they must be alive to the danger of splinters.

It all seems odd at first, but you get used to it. All the companies have workmen's compensation insurance, so it is really up to the individual contractors to decide what their employees need to wear.

Friday, January 8, 2010

It can't go on much longer....





Here are some photos of the pink tide, taken this morning.

I naively thought that today might be the last day of demolition out front, but I have just realized (peering through the window) that, although the demo guys have broken up all the brick, they now have a layer of concrete to get through. How wrong I was. The jack hammering started up at 8am. All our neighbors appeared to come out of the house and get in their cars at 8:05am. I am sure they are as sick of it as I am. I took Hubby's car to get petrol this morning and spent a moment with the garage squeegee wiping pinkness off the windows.

Out back we have a different crew of guys with jack hammers. These are with the pool renovation team. Their jack hammers are smaller but just as annoying. They are standing in the pool peeling the plaster off. The plaster bits fall into the bottom of the pool, where another guy shovels them up into the scoopy thing of a waiting Bob Cat. (Did I mention the Return of the Bob Cat yesterday?)

Both the demo guys at the front and the ones at the back are running generators, to add to the overall loveliness of the experience.

The pool renovation really is going along speedily, though (not like last time, when it took 7 months to get a not-very-good result). The pool is now eight inches deeper than it was, thanks to the building up of the walls with gunnite to allow for the leveling of the lot; the vault for the pool cover has been created; and most of the plaster is off.

Here's some photos of the pool guys in action:


Tuesday, January 5, 2010

Shingle-drills, shingle-drills, shingle all the way...

We now have a roof on the bedroom/bathroom addition - complete, nailed down and light brown in its cedar shingley goodness. The roof over the office/laundry is nearly done.

The drilling continued unabated till 4:30pm. The demo guys are now taking out the front path, which is made of bricks laid on concrete. It's very noisy and dusty. No mail came today: I suspect the mail man took one look at what was happening in our front yard and declined to come further.

This evening I received an email from Mike the Pool Guy, warning me that tomorrow around lunchtime they'll be "doing the gunnite" for the pool. I have no idea what that is, but Mike says it will be noisy and dusty. Well, I wonder if I'll notice the difference.

Weather continues bright and sunny.

Catch Up Report

Hello, dear readers (that means you, Anthony). I know you will be worried that my lack of writing will be a reflection of lack of progress, but how wrong you are. Even over the holiday period the guys have been working away, and things are going very well (at least to this amateur's eyes).

Landscaping:

The back yard is now a wasteland. All the concrete has now gone, except for a small piec
e around the pool which they have clearly decided to leave and concrete over, as part of the raising of the grading of the backyard. This was an exceptionally noisy and intrusive part of the whole remodel experience, with three BobCats in the yard at one point, one with a jack hammer attachment, the other two with different kinds of scoops; plus numerous guys with hand-held jack hammers and shovels. The planters are gone, the wall under the trees has gone, the lawn has gone. We have a big pile of mess in the area that used to be designated lawn, including all the loungers and chairs that Hubby wouldn't let me dispose of, and the old pool cover.

The pool has had its coping and water line tile removed, there are several holes punched in the bottom, and the light has been taken out. The bottom of the pool is full of shards of stuff. One of the pool's wall steps has been broken.

(Hold on, a man has just appeared in the ha
llway.)

(Just the electrician looking for the sub-panel.)

The wood framing for the concrete pouring around the pool has been erected, and rebars have been inserted around the top of the pool, presumably to hold the new coping. That is supposed to be arriving in the third week of January.



The little lemon tree that the kids bought for Hubby's 40th birthday is still standing bravely in the midst of all this. I tied some "Caution" tape around a couple of bamboo stakes to protect it, and miraculously this seems to have worked. Elsewhere, the drainage plans have been marked out on the ground in orange paint, so we can now see where the barbeque is going to be and also the planting beds near to the house.

House:
Jim says that we have a delay in the windows arriving, and that will slow down the completion of the walls. In the meantime, his guys are working away on the roof. The bedroom/bathroom addition now has roofing felt, and a pile of cedar shingles is waiting to go on. On the office/laundry addition, the shingles are already going on; the roof over the dining room is finished, and the office roof looks like it may be finished today. While we were away at the snow, the new gutters went on. The guys have also started to rough in the plumbing and electrics. Lots of thick yellow wires are strung across the wall framing, and a lovely black pipe indicates where the washing machine will go.

Current discussion is focusing on the kitchen. We have been scheduled to have the kitchen demolition next week, but our architect is now wondering if it can be put off a week, as we'll be away for a few days in February. Personally I suspect that they will over run anyway, so they may as well over run while we're away.

Monday, December 21, 2009

Action all around

It's all happening here this morning:

- men on the roof over the kitchen
- men in the family room engaging in more mysterious banging
- men in the back yard demolishing the coping from around the pool
- big crane on the drive in preparation to take down the Monterey Pine

Lots of noise. Rain currently staying away.